Century High School

Project Owner
Alhambra USD
Brief
New Campus
Year Completed
2012

scope

The work included demolishing the existing modular campus and the construction of the three new 2-story building housing 9 classrooms, and administration building, a student lunch building, and new site work for 1.1. acres. The sq. footage was approximately 14,277 SF. The building wil bee connected by a covered walkway at the first and second floors. The vertical circulation is from 2 main stairs and an ADA accessible elevator.