Category


Completed Projects

Best Western

scope The renovation project included a revamp of the lobby and business center. Property rooms and bathrooms were remodeled to meet customer satisfaction. Additional work that was conducted included, demo, electrical upgrades, rough plumbing, patching, new roof floors and painting.

John Muir TV Studio

scope of work The 6,300-square-foot project consists of a multi-camera television production studio, state-of-the-art control room, virtual studio, media lab, and career center.The new studio, located on the John Muir High School campus and developed with guidance by the district’s television station KLRN Pasadena, provides students in John Muir High School’s Arts, Entertainment, and Media..

AFC Urgent Care

scope AFC Urgent Care 3D Tour The  Nazerian Group recently completed the remodel project for the  AFC Urgent Care facility in Granada Hills. This renovation of the existing unit includes 8 exam rooms, a procedure room, X-Ray room, 2 triage rooms, reception and waiting rooms, manager office, break room, 2 doctor offices, and conference room. Accessibility..

La Mirada Library

scope The  Nazerian Group recently completed the La Mirada Library for the City of La Mirada. The renovation project consisted of enhancing the exterior by replacing existing window framing, glazing and asbestos fiber panels and replacing existing lighting fixtures, with new efficient fixtures. Interior construction included new non-bearing metal stud walls and building finishes, plumbing,..

Marguerita Elementary School

scope The project consisted of New Construction of a 2 story 9 Classroom Building and support spaces. Total square footage will be approx. 12,800 SF. Site work included a covered canopy connecting to existing walkway at cafeteria building.  The new building was part of the District’s master plan development and replaced 9 existing bungalow buildings..

Century High School

scope The work included demolishing the existing modular campus and the construction of the three new 2-story building housing 9 classrooms, and administration building, a student lunch building, and new site work for 1.1. acres. The sq. footage was approximately 14,277 SF. The building wil bee connected by a covered walkway at the first and..

Monterey Highlands Elementary School

SCOPE 2-Story building, housing 6 classrooms plus a computer lab, music room, and restroom facilities. Located prominently at the front of the campus, the new building is sited to define a new landscaped courtyard gathering space that will be shared with an existing 2-story classroom building. A pedestrian trussed bridge connects the new classrooms to..